Welcome to Bafinasa official website!

Office Work Navy Blue Double Breasted Blazer Office Dress

Source:News / Time:2026-11-14

This is a style that rewards a patient first sample. Every shortcut taken on the block comes back later as a return, a re-cut or a discount. Written down, the request is office work navy blue double breasted blazer office dress: a body, a length and a budget. Those three lines are enough to start a pattern, provided somebody writes the fourth line - the finish. We see this style in two versions. One is built to hit a price, the other to keep its shape for three seasons. They differ by about fifteen percent in cost and by a great deal in what comes back. Most of the money in a Office Work Navy Blue Double Breasted Blazer Office Dress sits in three places: the cloth, the front panel, and the labour that keeps the waist seam flat after pressing.

Under 200 gsm, plan to interface the front panel. Without it, the seam ridge shows through at the first press. Lining is not a detail. A 65 to 75 gsm taffeta slides over the cloth; a cheap lining grabs it and the garment climbs when the wearer walks. Keep one dye lot for bulk. Splitting a thousand pieces across two lots is how a reorder ends up with a visible line between sizes. For wool blend or ponte, order five to eight percent extra. Cutting around a shade band costs more than the cloth.

How it is built

Most of the handwork sits in a handful of steps, and each one has a right order. Pockets are cut on the straight grain and bar-tacked at the corners. A pocket that sags pulls the whole front out of line. The lining is joined at the armhole by hand or with a clean machine finish. A bagged lining that pulls is a return waiting to happen. Buttonholes on a blazer dress carry load. Back them with a strip of interfacing or they tear inside a season.

We keep the double breasted as its own pattern piece so it can be changed without re-cutting the body. The double breasted is where the eye lands first, so it is also where a two-millimetre error shows. Set it from the pattern, not from the sample.

Get the fit model measurements in the same units as the spec. Mixed units are the most common cause of a rejected first sample. For Blazer Office Dresses sold across regions, keep one measurement sheet per market; one market's Large is another market's Medium. A size run that stops at XL will not sell where the middle size is a Large. State the run and the grade rule at quoting, not at shipping.

The sheet we need before costing

Shella mid-weight wool blend or a firm ponte, swatch-approved, one dye lot for bulk
Bodyblazer dress
Lengthconfirmed on the wearer, in her shoes
Colourwaynavy
Liningfully lined, bagged hem
Closurestretch panel, no zip
Size runXS-2XL plus a curve block
Sample lead time12-18 days after spec sign-off
MOQ100 pcs per colour

What to check before bulk

  • Lining cut to the same length as the shell, so the dress climbs when worn.
  • Buttons placed by eye rather than from the pattern, so the front gapes between sizes.
  • Front panel fused too hot, so the cloth shines and the lapel edge shows a ridge.
  • A cheap hem shows: three centimetres with a clean catch-stitch reads expensive, one centimetre overlocked reads fast fashion.
  • Pressing decides the finish. A needle mark on a light cloth stays after QC, whatever the inspector does.

Lead time is normally 12 to 20 days for a first sample and 30 to 45 days for bulk, depending on stock cloth and handwork. Schedule an in-line check after the front panel goes on. Catching a rotation there costs minutes; catching it at final costs the order. AQL 2.5 on major and 4.0 on minor is a reasonable default here. Write it into the order so the inspection has a rule.

Options on the table

  • Single or double breasted front, without re-cutting the back.
  • Shoulder: soft pad, structured pad, or none with a clean finish.
  • Vent, back seam, or plain back.
  • Lining to match or contrast. Contrast adds a visible detail at the cuff.
  • Packing: flat-fold with tissue, hanger-ready, or a sealed bag per piece.
  • Sizing: a four-size test run, a standard eight-size run, or a graded run to your own sheet.

Sampling runs in three steps: a proto to check proportion, a fit sample to check the body, and a pre-production sample cut from bulk cloth. The pre-production sample has to be cut from the bulk lot, with the bulk trims, on the machine settings bulk will use.

Ask for two samples when the cloth is new to us: one in the buyer cloth, one in our closest stock cloth. The comparison usually settles the price question. If the price has to come down, take it out of handwork before taking it out of the cloth. The customer notices the cloth first.

If you are developing this style, send us a tech pack, a photo or a reference garment and we will quote within 24 hours. Contact bafinasa@bafinasa.com or WhatsApp +86 13827222469.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top