Welcome to Bafinasa official website!

Black Double Breasted Blazer Office Dress for Office Work

Source:News / Time:2026-11-14

Buyers arrive with a reference photo and a target price. The two numbers that decide whether that price is reachable are the cloth weight and how many seams run through the front panel. Most of the money in a Black Double Breasted Blazer Office Dress for Office Work sits in three places: the cloth, the front panel, and the labour that keeps the waist seam flat after pressing. The first conversation about this style is usually about length. The second, if the buyer is serious, is about the inside: lining, interlining, and where the seams are pressed.

Under 200 gsm, plan to interface the front panel. Without it, the seam ridge shows through at the first press. Cloth decides more than the brief admits. The same block in a 180 gsm wool blend and a 260 gsm double knit produces two different garments, one for the office and one for the evening. Keep one dye lot for bulk. Splitting a thousand pieces across two lots is how a reorder ends up with a visible line between sizes.

How it is built

The pattern sets the shape and the sewing protects it. A few steps decide whether it survives the third wash. Pockets are cut on the straight grain and bar-tacked at the corners. A pocket that sags pulls the whole front out of line. The vent, where there is one, is taped and pressed so it stays closed in the bag and opens when the wearer walks. The front needs a canvassed or well-fused panel. A soft front under a structured shoulder collapses within two wears.

If the double breasted is central to the style, price a second sample with a simpler version. Volume often goes to the simpler one. The double breasted reads as a design choice and behaves as a construction one. It changes the seam order, and sometimes the closure.

Tolerances belong on the sheet: plus or minus one centimetre on the body, half a centimetre on the front panel. Grading is where the quiet failures happen. Four sizes from one block need the armhole, the waist and the front panel to move at different rates. Get the fit model measurements in the same units as the spec. Mixed units are the most common cause of a rejected first sample.

The sheet we need before costing

Shella mid-weight wool blend or a firm ponte, swatch-approved, one dye lot for bulk
Bodyblazer dress
Lengthconfirmed on the wearer, in her shoes
Colourwayblack
Lininghalf lined to the hip
Closureinvisible centre-back zip
Size runXS-2XL plus a curve block
Sample lead time15-20 days with handwork
MOQ300 pcs per style

The places this usually goes wrong

  • Sleeve head pleated instead of eased, giving a pucker that cannot be pressed out.
  • Front panel fused too hot, so the cloth shines and the lapel edge shows a ridge.
  • Buttons placed by eye rather than from the pattern, so the front gapes between sizes.
  • A cheap hem shows: three centimetres with a clean catch-stitch reads expensive, one centimetre overlocked reads fast fashion.
  • A cheap hem shows: three centimetres with a clean catch-stitch reads expensive, one centimetre overlocked reads fast fashion.

Trims are ordered against confirmed quantity plus three percent. Short trims stop a line faster than short cloth. Lead time is normally 12 to 20 days for a first sample and 30 to 45 days for bulk, depending on stock cloth and handwork. Schedule an in-line check after the front panel goes on. Catching a rotation there costs minutes; catching it at final costs the order.

Customisation that does not break the price

  • Vent, back seam, or plain back.
  • Sleeve length: full, three-quarter, or sleeveless with a faced armhole.
  • Shoulder: soft pad, structured pad, or none with a clean finish.
  • Lining to match or contrast. Contrast adds a visible detail at the cuff.
  • Sizing: a four-size test run, a standard eight-size run, or a graded run to your own sheet.
  • Private label: woven label, care label and hangtag to your artwork.

Photograph each stage on the same model and keep the photos with the spec sheet. Most disputes end there. Sampling runs in three steps: a proto to check proportion, a fit sample to check the body, and a pre-production sample cut from bulk cloth. The fit sample is where the pattern is corrected. Changes after this point cost time, not only money.

A reorder is easier than a first order, provided the approved sample and the measurement sheet were kept together. Send the tech pack as a PDF with a measurement table, not as a photo with notes in a chat. Photos carry intent, tables carry production.

If you are developing this style, send us a tech pack, a photo or a reference garment and we will quote within 24 hours. Contact bafinasa@bafinasa.com or WhatsApp +86 13827222469.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top